Shotcrete excavation wall secured with Hollow Bolt Anchors

In 2001 the Brantford General Hospital undertook a US$ 65 million expansion program in order to secure its future as a first class medical clinic.

With these extensions another Canadian project was completed that featured an excavation secured by a nailed shotcrete wall using DYWI® Drill Hollow Bars.

To meet the strict requirements for the working plan, the position of the boreholes, the wall deformations and the allowable vibrations, HC Matcon, a Joint Venture of the HC Group and Matcon Excavating of Vancouver, BC, decided to stabilize the walls of the 8 storey high hospital by means of nailed shotcrete. In order to keep deformations low, the soil nails were provided with a free length of up to 5 m and were slightly tensioned.

As an alternative proposal to the conventional bored pile wall system, Isherwood Associates design required a vertical, up to 13.11 m deep soil retention system secured with up to 7 rows of soil nails. The soil consisted of coarse sand with low density and little cohesion. Based on these demanding soil conditions, vertical drilled micropiles were installed along the wall in order to eliminate a potential landslide at the onset of the excavations. The DYWI® Drill Hollow Bars offered the possibility of drilling and grouting at the same time.

Thus cased holes were not required which in turn saved time and material. The tensioning of the anchors resulted in a remarkably low wall deformation of only 4 mm.

Nailed shotcrete walls accelerated the foundation construction, since excavation and stabilization of the site took place at the same time. As a result it was not necessary to build a sheet pile wall before the excavation could begin.

Supply

Brantford General Hospital, Brantford, Ontario, Canada

HC Matcon Inc., Ayr, Ontario, Canada

Isherwood Associates Ltd.,Mississauga, Ontario, Canada